SEINE COMTESSE
During the winter 2016/2017 we performed big maintenance on the vessel.
- Renewed all the box coolers in the main engine-room.
- Performed inspections to multiple electrical components.
- Solved some electrical issues.
- Revision of the generator-sets in the Main Engine-Room.
- Replaced custom made woodworking.
- Executed multiple inspections to the hydraulic system.
- Maintained and serviced the hydraulics system of the cranes, exhaust system, masts, sun tent and wheelhouse. We changed the hydraulic lines and connections.
![](https://www.jjnauticalprojects.eu/wp-content/uploads/2017/05/IMG_9402.jpg)
![](https://www.jjnauticalprojects.eu/wp-content/uploads/2017/05/IMG_9403.jpg)
![](https://www.jjnauticalprojects.eu/wp-content/uploads/2017/05/IMG_9406.jpg)
![](https://www.jjnauticalprojects.eu/wp-content/uploads/2017/05/IMG_9404.jpg)
![](https://www.jjnauticalprojects.eu/wp-content/uploads/2017/05/seine-comtesse.jpg)